xdxadmin
07-22-2004, 01:50 PM
Meat Processing Plant Walk-In Tender Cooler, Northern Illinois Area
XDX reduced the system run-time by 40% while reducing the 4 daily defrosts (168 minutes total) to one 36 minute daily defrost. Conventionally, the system operated above 36F for 177 minutes in a 24 hour period. With XDX, that operation time was reduced by 77.5% to only 40 minutes in a 24 hour period.
Key: Food Processing, Walk-in Coolers
XDX reduced the system run-time by 40% while reducing the 4 daily defrosts (168 minutes total) to one 36 minute daily defrost. Conventionally, the system operated above 36F for 177 minutes in a 24 hour period. With XDX, that operation time was reduced by 77.5% to only 40 minutes in a 24 hour period.
Key: Food Processing, Walk-in Coolers